Earthworks Specification

Earthworks Specification

Providing solutions for 25 years.


Earthworks are often required as part of a development for a number of reasons such as:
  • Raising ground levels as part of flood alleviation schemes.
  • Creation of noise and landscape bunds.
  • Infilling of excavations such as quarries
  • Creation of stable development platforms.
  • Re-engineering of soils as part of a contamination remediation scheme.
  • Slope stabilisation
As part of the earthworks design process GRM can also carry out the following:
  • Ground investigation allied to geotechnical laboratory testing to provide the parameters required in order to preparation earthworks specifications.
  • Preparation of method specifications.
  • Preparation of performance specifications.
  • Criteria for suitability of fill.
  • Method Statements.
  • Supervision of the earthworks.
  • Compliance testing.
  • Earthworks completion reports.
  • Estimation and mitigation of settlement.
For further information, please contact Clive Kirby

Share by: